Our crews arrive early and on time. For GTA projects, crews usually arrive at your home between 8-9 am. Most installations are completed on the same day or, within two days for larger projects. Occasionally we will schedule multiple crews to the same project to minimize the duration of the renovation period for our clients. Large multiplex projects require more time. You will know it is us, by our uniformly marked trucks that you see driving all over town! Our crew will ask for permission before they pull into your driveway. Each of our eight installation crews, have a lead installer who is responsible for your installation. You will know this contractor, as it will be the same one who re-measured your windows for production. If a discrepancy is found by the installer, the office is notified to correct the error (same-day when possible). Before proceeding our crew will cover their work boots and proceed to lay out clean work blankets in the areas of the home where installations will take place. They will commence your work from the highest elevation and work towards the ground. We will work quickly removing one window at a time, preparing the opening and installing the new window before moving onto the next room. Our goal is to start a room and finish it before moving onto the next. As each area is finished, we will remove any debris and ensure the area is left tidy. Once the crew has moved into the final clean-up stage, the lead installer will walk you through your newly installed products to show you how to properly operate them and to ensure your satisfaction. Window & Door Installation Tips The Industry’s “Achilles Heel” is proper installation. If you buy a good window and install it improperly, you have nothing. Our installation crews network daily with our Service personnel to ensure excellence from start to finish. You receive only factory-trained, SAWDAC certified professionals every step of the way. Every window installation must be carefully thought out from start to finish. In the process of removing the old and replacing with the new, re-construction may be required and should only be done by an experienced professional. We Offer the Following Types of Installation Services: 200S Retro-Fit Basic Installation (Windows are installed in the existing frames). 200BB Full Frame Out , Brick to Brick Installation, with Wood Paint Grade Jamb. 202s Full Frame Out, Brick to Brick Installation, with Brick Mould on the Exterior Frame. 203S Full Frame Out, Brick to Brick Installation. All Vinyl Trims on the Interior (Includes Vinyl Casing, Rosettes and Jambs) Aluminum Capping on Exterior. 203SBM Full Frame Out, Brick to Brick Installation. All Vinyl Trims on the Interior (Includes Vinyl Casing, Rosettes and Jambs) Brick Mould on the Exterior Frame. 204S Full Frame Out, Brick to Brick Installation. No Finishing on the Inside (Purchaser will Finish on the Interior). 205S Full Frame Out, Brick to Brick Installation. 3/4” Wood Return Only (Purchaser Will Finish on the Interior). 206S Full Frame Out, Brick to Brick Installation.Vinyl Jamb Only (Purchaser Will Finish on the Interior). Share This Story, Choose Your Platform!
0 Comments
Leave a Reply. |